| Day | STAC (%) | EXPECT (%) | Travelers | Drivers | Free Flow Travel Cost (€) | Collected Revenues (€) | Peak Period Length (h) | Congestion (%) | Mileage (10^6 km) | Speed (km/h) | Number of Roads | Travel Time (min) | Travel Cost (€) | Consumer Surplus (€) | Equity (€) | Mean Early Delay (min) | Mean Late Delay (min) | Schedule Delay Cost (€) | Early Ratio (%) | On-Time Ratio (%) | Late Ratio (%) |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 0 | 0.0 | 0.0 | 4000 | 30 | 21.9 | 0.0 | 2.53472 | 0.0 | 0.003 | 45.6621 | 6.0 | 131.4 | 22.8414 | -1.94126 | 0.00191903 | 12.4556 | 5.43095 | 0.941389 | 50.0 | 26.6667 | 23.3333 |