Back

Run 11

The run was canceled.

Results

Day STAC (%) EXPECT (%) Travelers Drivers Free Flow Travel Cost (€) Collected Revenues (€) Peak Period Length (h) Congestion (%) Mileage (10^6 km) Speed (km/h) Number of Roads Travel Time (min) Travel Cost (€) Consumer Surplus (€) Equity (€) Mean Early Delay (min) Mean Late Delay (min) Schedule Delay Cost (€) Early Ratio (%) On-Time Ratio (%) Late Ratio (%)
6 1.29142 12.4988 504280 504280 0.27865 23062.0 0.00138889 319.684 0.884816 15.0037 1.47914 307.035 104.835 -15.5871 7.97598 143.666 174.526 53.6164 9.83243 0.0275641 90.14
5 1.82042 12.3155 504280 504280 0.40177 35618.0 5.21944 365.641 1.27451 13.5096 1.74068 279.623 96.8996 -16.4775 4.71571 125.797 172.993 50.2252 15.5354 0.189577 84.275
4 2.09859 10.2412 504280 504280 0.586653 35038.0 5.26806 333.867 1.85814 14.4767 2.1375 227.006 83.2552 -14.8997 4.35277 111.997 170.594 45.3514 23.8949 0.273657 75.8315
3 2.45057 6.99238 504280 504280 0.726245 43478.0 5.07583 340.788 2.30612 14.2855 2.46771 184.63 70.0619 -12.1675 4.23793 90.973 163.725 39.204 31.7853 0.794797 67.4199
2 2.91591 5.12872 504280 504280 0.928259 50134.0 4.82028 425.891 2.93084 11.9057 2.85268 144.625 55.8477 -10.3038 3.97935 63.472 143.122 31.6441 34.6286 2.88114 62.4903
1 3.19124 3.3453 504280 504280 1.20315 75462.0 4.67 423.059 3.79942 11.9722 3.44981 96.7679 37.2618 -8.42122 3.40555 45.6042 110.107 20.9842 40.7113 6.33002 52.9587
0 1.73102 2.853 504280 504280 1.76648 96162.0 4.4525 173.102 5.58247 22.9467 4.85173 29.5382 10.6649 -6.9655 2.68931 25.9968 29.8051 5.5512 36.0449 15.94 48.0152