| Day | STAC (%) | EXPECT (%) | Travelers | Drivers | Free Flow Travel Cost (€) | Collected Revenues (€) | Peak Period Length (h) | Congestion (%) | Mileage (10^6 km) | Speed (km/h) | Number of Roads | Travel Time (min) | Travel Cost (€) | Consumer Surplus (€) | Equity (€) | Mean Early Delay (min) | Mean Late Delay (min) | Schedule Delay Cost (€) | Early Ratio (%) | On-Time Ratio (%) | Late Ratio (%) |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 0 | 0.345067 | 0.555773 | 504280 | 504280 | 1.61295 | 0.0 | 2.62056 | 34.5067 | 5.10172 | 46.6317 | 4.67708 | 13.0171 | 4.14088 | -4.05046 | 0.981656 | 23.9568 | 11.0842 | 1.97136 | 51.94 | 22.7693 | 25.2907 |