Back

constant_time_interval_1_0730_0830_2_day_fixed

The run successfully ended. End time: April 17, 2026, 8:40 p.m.. Running time: 0:00:08.339391.
Results on network
Download link-specific results
Download traveler-specific results

Results

Day STAC (%) EXPECT (%) Travelers Drivers Free Flow Travel Cost (€) Collected Revenues (€) Peak Period Length (h) Congestion (%) Mileage (10^6 km) Speed (km/h) Number of Roads Travel Time (min) Travel Cost (€) Consumer Surplus (€) Equity (€) Mean Early Delay (min) Mean Late Delay (min) Schedule Delay Cost (€) Early Ratio (%) On-Time Ratio (%) Late Ratio (%)
1 0.28528 0.19425 255909 162788 2.558 243063.0 1.34167 28.528 2.35192 43.9442 4.70608 19.7265 8.38725 -4.30768 1.48988 27.7811 13.1192 3.60637 39.5711 14.5656 45.8633
0 0.645084 0.832331 255909 194796 2.85055 483385.0 1.59556 64.5084 3.14443 34.4227 4.9992 28.1364 15.0512 -4.30768 1.48988 19.3605 25.9271 7.88027 19.3946 11.1358 69.4696

Log