Back

Run 4

The run successfully ended. End time: March 25, 2025, 3:21 p.m.. Running time: 0:00:06.943429.
Results on network
Download link-specific results
Download traveler-specific results

Results

Day STAC (%) EXPECT (%) Travelers Drivers Free Flow Travel Cost (€) Collected Revenues (€) Peak Period Length (h) Congestion (%) Mileage (10^6 km) Speed (km/h) Number of Roads Travel Time (min) Travel Cost (€) Consumer Surplus (€) Equity (€) Mean Early Delay (min) Mean Late Delay (min) Schedule Delay Cost (€) Early Ratio (%) On-Time Ratio (%) Late Ratio (%)
1 0.405047 0.168432 255882 175982 2.57478 0.0 1.40139 31.6063 2.56525 43.0174 4.76616 20.3314 7.52337 -3.97565 0.959912 22.2008 15.4236 4.1348 31.5856 14.9862 53.4282
0 0.647741 0.836833 255882 194736 2.85493 0.0 1.59083 64.7741 3.14864 34.371 5.00251 28.2252 12.5983 -3.99736 0.965549 19.2489 25.9792 7.8941 19.4468 11.0842 69.4689

Log