| Day | STAC (%) | EXPECT (%) | Travelers | Drivers | Free Flow Travel Cost (€) | Collected Revenues (€) | Peak Period Length (h) | Congestion (%) | Mileage (10^6 km) | Speed (km/h) | Number of Roads | Travel Time (min) | Travel Cost (€) | Consumer Surplus (€) | Equity (€) | Mean Early Delay (min) | Mean Late Delay (min) | Schedule Delay Cost (€) | Early Ratio (%) | On-Time Ratio (%) | Late Ratio (%) |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 0 | 0.0 | 0.0 | 4000 | 2000 | 10.4722 | 0.0 | 2.45167 | 0.0 | 0.11 | 52.5199 | 6.0 | 62.8333 | 11.8229 | -12.73 | 0.108138 | 21.4407 | 5.64216 | 1.35066 | 59.7 | 25.2 | 15.1 |