| Day | STAC (%) | EXPECT (%) | Travelers | Drivers | Free Flow Travel Cost (€) | Collected Revenues (€) | Peak Period Length (h) | Congestion (%) | Mileage (10^6 km) | Speed (km/h) | Number of Roads | Travel Time (min) | Travel Cost (€) | Consumer Surplus (€) | Equity (€) | Mean Early Delay (min) | Mean Late Delay (min) | Schedule Delay Cost (€) | Early Ratio (%) | On-Time Ratio (%) | Late Ratio (%) |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 0 | 0.603346 | 1.17059 | 140032 | 140032 | 2.2108 | 0.0 | 5.48556 | 60.3346 | 2.46031 | 49.5104 | 93.2636 | 24.0451 | 6.47964 | -3.92532 | 1.97546 | 24.8846 | 33.8751 | 2.47594 | 38.137 | 23.4089 | 38.4541 |