| Day | STAC (%) | EXPECT (%) | Travelers | Drivers | Free Flow Travel Cost (€) | Collected Revenues (€) | Peak Period Length (h) | Congestion (%) | Mileage (10^6 km) | Speed (km/h) | Number of Roads | Travel Time (min) | Travel Cost (€) | Consumer Surplus (€) | Equity (€) | Mean Early Delay (min) | Mean Late Delay (min) | Schedule Delay Cost (€) | Early Ratio (%) | On-Time Ratio (%) | Late Ratio (%) |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 0 | 0.405641 | 1.50691 | 204499 | 204499 | 1.27892 | 0.0 | 2.35917 | 40.5641 | 4.13865 | 52.3104 | 114.409 | 23.2157 | 3.40502 | -2.84325 | 1.01206 | 23.8612 | 22.3927 | 1.60625 | 25.5698 | 35.473 | 38.9572 |