| Day | STAC (%) | EXPECT (%) | Travelers | Drivers | Free Flow Travel Cost (€) | Collected Revenues (€) | Peak Period Length (h) | Congestion (%) | Mileage (10^6 km) | Speed (km/h) | Number of Roads | Travel Time (min) | Travel Cost (€) | Consumer Surplus (€) | Equity (€) | Mean Early Delay (min) | Mean Late Delay (min) | Schedule Delay Cost (€) | Early Ratio (%) | On-Time Ratio (%) | Late Ratio (%) |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 0 | 0.195029 | 0.305978 | 204499 | 204499 | 2.0404 | 0.0 | 5.81833 | 19.5029 | 3.29165 | 66.0089 | 86.559 | 14.6633 | 4.24402 | -3.80365 | 1.71202 | 25.0608 | 19.7474 | 1.80004 | 47.1826 | 19.5429 | 33.2745 |