| Day | STAC (%) | EXPECT (%) | Travelers | Drivers | Free Flow Travel Cost (€) | Collected Revenues (€) | Peak Period Length (h) | Congestion (%) | Mileage (10^6 km) | Speed (km/h) | Number of Roads | Travel Time (min) | Travel Cost (€) | Consumer Surplus (€) | Equity (€) | Mean Early Delay (min) | Mean Late Delay (min) | Schedule Delay Cost (€) | Early Ratio (%) | On-Time Ratio (%) | Late Ratio (%) |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 0 | 3.89794 | 9.0059 | 3078640 | 3078640 | 1.67631 | 0.0 | 3.51 | 389.794 | 31.0974 | 14.0597 | 24.9182 | 82.5228 | 34.0625 | -11.5355 | 3.29406 | 56.3505 | 94.5133 | 18.6639 | 31.2742 | 3.81929 | 64.9066 |