| Day | STAC (%) | EXPECT (%) | Travelers | Drivers | Free Flow Travel Cost (€) | Collected Revenues (€) | Peak Period Length (h) | Congestion (%) | Mileage (10^6 km) | Speed (km/h) | Number of Roads | Travel Time (min) | Travel Cost (€) | Consumer Surplus (€) | Equity (€) | Mean Early Delay (min) | Mean Late Delay (min) | Schedule Delay Cost (€) | Early Ratio (%) | On-Time Ratio (%) | Late Ratio (%) |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 0 | 0.0 | 0.0 | 200 | 87 | 2.06667 | 0.0 | 2.46 | 0.0 | 0.0009309 | 51.7742 | 4.0 | 12.4 | 3.65032 | -0.129534 | 0.00504089 | 25.1094 | 4.03167 | 1.58365 | 60.9195 | 16.092 | 22.9885 |