| Day | STAC (%) | EXPECT (%) | Travelers | Drivers | Free Flow Travel Cost (€) | Collected Revenues (€) | Peak Period Length (h) | Congestion (%) | Mileage (10^6 km) | Speed (km/h) | Number of Roads | Travel Time (min) | Travel Cost (€) | Consumer Surplus (€) | Equity (€) | Mean Early Delay (min) | Mean Late Delay (min) | Schedule Delay Cost (€) | Early Ratio (%) | On-Time Ratio (%) | Late Ratio (%) |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 0 | 0.0 | 0.0 | 200 | 89 | 2.06667 | 0.0 | 2.32139 | 0.0 | 0.0009523 | 51.7742 | 4.0 | 12.4 | 3.08945 | -0.12988 | 0.00554568 | 17.7167 | 4.32024 | 1.02278 | 53.9326 | 30.3371 | 15.7303 |