| Day | STAC (%) | EXPECT (%) | Travelers | Drivers | Free Flow Travel Cost (€) | Collected Revenues (€) | Peak Period Length (h) | Congestion (%) | Mileage (10^6 km) | Speed (km/h) | Number of Roads | Travel Time (min) | Travel Cost (€) | Consumer Surplus (€) | Equity (€) | Mean Early Delay (min) | Mean Late Delay (min) | Schedule Delay Cost (€) | Early Ratio (%) | On-Time Ratio (%) | Late Ratio (%) |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 0 | 0.0 | 0.0 | 40 | 17 | 2.06667 | 0.0 | 16.5989 | 0.0 | 0.0001819 | 51.7742 | 4.0 | 12.4 | 3.91757 | -0.12997 | 0.00650575 | 27.6409 | 4.59583 | 1.8509 | 64.7059 | 11.7647 | 23.5294 |