| Day | STAC (%) | EXPECT (%) | Travelers | Drivers | Free Flow Travel Cost (€) | Collected Revenues (€) | Peak Period Length (h) | Congestion (%) | Mileage (10^6 km) | Speed (km/h) | Number of Roads | Travel Time (min) | Travel Cost (€) | Consumer Surplus (€) | Equity (€) | Mean Early Delay (min) | Mean Late Delay (min) | Schedule Delay Cost (€) | Early Ratio (%) | On-Time Ratio (%) | Late Ratio (%) |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 0 | 0.0 | 0.0 | 40 | 17 | 2.06667 | 0.0 | 16.5206 | 0.0 | 0.0001819 | 51.7742 | 4.0 | 12.4 | 3.14788 | -0.130215 | 0.00549864 | 18.1074 | 14.4 | 1.08121 | 52.9412 | 41.1765 | 5.88235 |