| Day | STAC (%) | EXPECT (%) | Travelers | Drivers | Free Flow Travel Cost (€) | Collected Revenues (€) | Peak Period Length (h) | Congestion (%) | Mileage (10^6 km) | Speed (km/h) | Number of Roads | Travel Time (min) | Travel Cost (€) | Consumer Surplus (€) | Equity (€) | Mean Early Delay (min) | Mean Late Delay (min) | Schedule Delay Cost (€) | Early Ratio (%) | On-Time Ratio (%) | Late Ratio (%) |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 0 | 0.0 | 0.0 | 40 | 21 | 2.0 | 0.0 | 2.71083 | 0.0 | 0.00021 | 50.0 | 2.0 | 12.0 | 3.13122 | -0.101088 | 0.00623231 | 18.5867 | 1.56667 | 1.13122 | 71.4286 | 23.8095 | 4.7619 |