| Day | STAC (%) | EXPECT (%) | Travelers | Drivers | Free Flow Travel Cost (€) | Collected Revenues (€) | Peak Period Length (h) | Congestion (%) | Mileage (10^6 km) | Speed (km/h) | Number of Roads | Travel Time (min) | Travel Cost (€) | Consumer Surplus (€) | Equity (€) | Mean Early Delay (min) | Mean Late Delay (min) | Schedule Delay Cost (€) | Early Ratio (%) | On-Time Ratio (%) | Late Ratio (%) |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 0 | 2.19837 | 2.05166 | 308073 | 308073 | 2.48954 | 0.0 | 3.50722 | 219.837 | 4.62878 | 21.2368 | 42.771 | 33.2769 | 13.1058 | -8.84757 | 2.78157 | 45.401 | 40.5568 | 6.90134 | 46.5042 | 10.5082 | 42.9875 |