Back

Run 15

The run was canceled.

Results

Day STAC (%) EXPECT (%) Travelers Drivers Free Flow Travel Cost (€) Collected Revenues (€) Peak Period Length (h) Congestion (%) Mileage (10^6 km) Speed (km/h) Number of Roads Travel Time (min) Travel Cost (€) Consumer Surplus (€) Equity (€) Mean Early Delay (min) Mean Late Delay (min) Schedule Delay Cost (€) Early Ratio (%) On-Time Ratio (%) Late Ratio (%)
4 1.02653 0.495471 236785 236187 3.10015 0.0 5.57333 95.4699 4.18044 34.6168 59.2044 30.3452 11.3325 -9.95834 3.42923 52.3986 29.6062 5.33872 62.4238 10.4904 27.0857
3 1.17674 0.741636 236785 236187 3.16765 0.0 5.53583 128.293 4.24744 29.4649 60.4354 35.1642 13.3662 -9.83736 3.32691 52.4407 39.6731 6.41137 58.2564 9.86168 31.8819
2 1.14044 1.10337 236785 236187 3.22294 0.0 5.48333 153.523 4.34383 26.6701 62.1744 39.2095 15.2907 -9.60222 3.17032 52.04 47.4338 7.5216 53.4585 9.37647 37.165
1 0.934316 1.87922 236785 236187 3.22735 0.0 5.40861 209.797 4.26974 21.3922 61.241 43.2216 17.6158 -9.21785 2.90782 50.0655 58.5632 9.06011 49.2165 9.32481 41.4587
0 1.4474 1.72327 236785 236187 2.81191 0.0 5.34278 144.74 3.91323 28.4561 46.8508 33.4587 13.8175 -8.61004 2.59617 46.7915 45.2419 7.19182 49.764 10.4972 39.7389