| Day | STAC (%) | EXPECT (%) | Travelers | Drivers | Free Flow Travel Cost (€) | Collected Revenues (€) | Peak Period Length (h) | Congestion (%) | Mileage (10^6 km) | Speed (km/h) | Number of Roads | Travel Time (min) | Travel Cost (€) | Consumer Surplus (€) | Equity (€) | Mean Early Delay (min) | Mean Late Delay (min) | Schedule Delay Cost (€) | Early Ratio (%) | On-Time Ratio (%) | Late Ratio (%) |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 0 | 2.7899 | 5.03469 | 90912 | 90912 | 0.463631 | 0.0 | 4.44972 | 278.99 | 3.49207 | 21.8606 | 95.0523 | 129.736 | 17.7699 | -2.69715 | 0.505257 | 15.4256 | 134.745 | 15.6076 | 1.38926 | 29.192 | 69.4188 |