| Day | STAC (%) | EXPECT (%) | Travelers | Drivers | Free Flow Travel Cost (€) | Collected Revenues (€) | Peak Period Length (h) | Congestion (%) | Mileage (10^6 km) | Speed (km/h) | Number of Roads | Travel Time (min) | Travel Cost (€) | Consumer Surplus (€) | Equity (€) | Mean Early Delay (min) | Mean Late Delay (min) | Schedule Delay Cost (€) | Early Ratio (%) | On-Time Ratio (%) | Late Ratio (%) |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 0 | 68.3682 | 0.180716 | 120000 | 120000 | 1.00196 | 0.0 | -17.2042 | 6836.82 | 0.59943 | 0.7187 | 2.04574 | 7.12365 | 2.14112 | -6.47474 | 0.0200072 | 8.35643 | 6.7027 | 0.953848 | 53.7458 | 20.3133 | 25.9408 |