| Day | STAC (%) | EXPECT (%) | Travelers | Drivers | Free Flow Travel Cost (€) | Collected Revenues (€) | Peak Period Length (h) | Congestion (%) | Mileage (10^6 km) | Speed (km/h) | Number of Roads | Travel Time (min) | Travel Cost (€) | Consumer Surplus (€) | Equity (€) | Mean Early Delay (min) | Mean Late Delay (min) | Schedule Delay Cost (€) | Early Ratio (%) | On-Time Ratio (%) | Late Ratio (%) |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 0 | 0.0 | 0.0 | 2000 | 2000 | 5.00556 | 0.0 | 2.50944 | 0.0 | 0.05 | 49.9445 | 7.0 | 30.0333 | 6.40912 | -7.21909 | 0.0316117 | 22.2207 | 5.72032 | 1.40356 | 60.3 | 24.65 | 15.05 |