Back

Run with disaggregated results

The run was canceled.

Results

Day STAC (%) EXPECT (%) Travelers Drivers Free Flow Travel Cost (€) Collected Revenues (€) Peak Period Length (h) Congestion (%) Mileage (10^6 km) Speed (km/h) Number of Roads Travel Time (min) Travel Cost (€) Consumer Surplus (€) Equity (€) Mean Early Delay (min) Mean Late Delay (min) Schedule Delay Cost (€) Early Ratio (%) On-Time Ratio (%) Late Ratio (%)
2 0.939725 0.00178249 1162040 753161 3.95217 0.0 4.29583 0.125759 10.589 74.6826 34.2977 12.1479 7.13552 -7.23312 4.06757 23.9968 14.1819 2.8797 49.5119 23.2468 27.2413
1 0.94744 0.00322797 1162040 753161 3.95249 0.0 4.29583 0.273107 10.5896 74.5707 34.3106 12.1654 7.14536 -7.23312 4.06757 24.0 14.2007 2.88341 49.4882 23.233 27.2788
0 0.026794 0.0270059 1162040 753260 3.94959 0.0 4.29528 2.6794 10.5841 72.8294 34.3076 12.3575 7.24524 -7.23313 4.06753 24.0106 14.5723 2.91599 49.3062 23.1623 27.5315