| Day | STAC (%) | EXPECT (%) | Travelers | Drivers | Free Flow Travel Cost (€) | Collected Revenues (€) | Peak Period Length (h) | Congestion (%) | Mileage (10^6 km) | Speed (km/h) | Number of Roads | Travel Time (min) | Travel Cost (€) | Consumer Surplus (€) | Equity (€) | Mean Early Delay (min) | Mean Late Delay (min) | Schedule Delay Cost (€) | Early Ratio (%) | On-Time Ratio (%) | Late Ratio (%) |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 4 | 0.171538 | 0.13534 | 264000 | 166354 | 2.75484 | 138911.0 | 1.21528 | 38.6626 | 2.52993 | 39.8126 | 4.59667 | 22.9196 | 6.221 | -5.11443 | 1.66522 | 20.8561 | 4.87267 | 1.56605 | 65.6269 | 24.6541 | 9.71903 |
| 3 | 0.187848 | 0.15124 | 264000 | 166189 | 2.76724 | 140267.0 | 1.20111 | 40.9432 | 2.53879 | 39.1683 | 4.60308 | 23.4014 | 6.33148 | -5.12905 | 1.66398 | 20.9152 | 5.12901 | 1.58723 | 65.1782 | 24.3398 | 10.482 |
| 2 | 0.210165 | 0.174403 | 264000 | 166362 | 2.7822 | 141044.0 | 1.20028 | 44.7096 | 2.55396 | 38.1307 | 4.60951 | 24.1566 | 6.50016 | -5.12903 | 1.65855 | 21.1676 | 5.52563 | 1.62624 | 63.5043 | 24.2471 | 12.2486 |
| 1 | 0.228577 | 0.278507 | 264000 | 170985 | 2.84768 | 152460.0 | 1.21944 | 55.7871 | 2.6936 | 35.5102 | 4.69519 | 26.6179 | 7.11814 | -5.11436 | 1.64729 | 20.9106 | 7.26694 | 1.79016 | 53.5217 | 24.3179 | 22.1604 |
| 0 | 0.578674 | 0.784723 | 264000 | 187815 | 2.88539 | 209773.0 | 1.44944 | 57.8674 | 3.0245 | 35.3531 | 4.85163 | 27.3305 | 9.26277 | -4.94476 | 1.59887 | 19.8474 | 14.3495 | 3.59077 | 33.557 | 17.5258 | 48.9173 |