| Day | STAC (%) | EXPECT (%) | Travelers | Drivers | Free Flow Travel Cost (€) | Collected Revenues (€) | Peak Period Length (h) | Congestion (%) | Mileage (10^6 km) | Speed (km/h) | Number of Roads | Travel Time (min) | Travel Cost (€) | Consumer Surplus (€) | Equity (€) | Mean Early Delay (min) | Mean Late Delay (min) | Schedule Delay Cost (€) | Early Ratio (%) | On-Time Ratio (%) | Late Ratio (%) |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1 | 3.90852 | 1.94111 | 1163740 | 1098720 | 6.81254 | 0.0 | 4.63194 | 390.852 | 26.716 | 15.2847 | 151.406 | 52.1869 | 27.0786 | -14.6649 | 6.27777 | 32.6748 | 59.6551 | 8.79582 | 30.1708 | 10.7332 | 59.096 |
| 0 | 4.06599 | 2.51823 | 1163740 | 1098720 | 5.90663 | 0.0 | 4.64889 | 406.599 | 23.7051 | 15.1559 | 121.601 | 47.1878 | 24.7731 | -14.6649 | 6.27777 | 28.8034 | 58.1607 | 8.2417 | 31.3286 | 11.579 | 57.0925 |