Back

Run with toll on North, West, South and East axis

The run successfully ended. End time: Jan. 2, 2019, 2:43 p.m.. Running time: 0:00:58.998984.
Results on network
Download link-specific results
Download traveler-specific results

Results

Day STAC (%) EXPECT (%) Travelers Drivers Free Flow Travel Cost (€) Collected Revenues (€) Peak Period Length (h) Congestion (%) Mileage (10^6 km) Speed (km/h) Number of Roads Travel Time (min) Travel Cost (€) Consumer Surplus (€) Equity (€) Mean Early Delay (min) Mean Late Delay (min) Schedule Delay Cost (€) Early Ratio (%) On-Time Ratio (%) Late Ratio (%)
7 0.26791 0.19326 255909 165393 2.85324 87950.0 1.22278 45.5318 2.6088 37.9863 4.71428 24.9142 6.22162 -4.98182 1.30703 20.995 4.52582 1.53748 65.3933 25.8808 8.72588
6 0.292737 0.207331 255909 165773 2.86485 89522.0 1.21833 47.723 2.62476 37.4132 4.71899 25.3923 6.32146 -4.96854 1.30523 21.0862 4.81275 1.54939 64.2119 26.044 9.74405
5 0.317881 0.225503 255909 166037 2.88128 90440.0 1.21083 50.0673 2.643 36.8147 4.72386 25.9431 6.42839 -4.96384 1.28348 21.0873 5.11917 1.55983 62.8529 26.1562 10.9909
4 0.344965 0.247667 255909 166559 2.89662 92076.0 1.215 52.7952 2.66517 36.154 4.73615 26.5554 6.57392 -4.93847 1.28366 21.2784 5.61925 1.59521 60.9454 26.3102 12.7444
3 0.373083 0.264824 255909 166998 2.9148 93110.0 1.215 54.1107 2.68752 35.8261 4.74205 26.9521 6.69363 -4.90456 1.2679 21.3773 6.15054 1.64406 59.6833 25.9494 14.3672
2 0.408482 0.318611 255909 168169 2.93966 97628.0 1.21083 59.0673 2.72977 34.7139 4.76202 28.0562 6.97958 -4.87923 1.24555 21.3703 7.01608 1.72301 56.4373 25.8799 17.6828
1 0.426632 0.327297 255909 170448 2.94116 102311.0 1.22333 59.8466 2.77071 34.5763 4.77523 28.208 7.08516 -4.85055 1.22808 21.388 7.65071 1.78358 53.394 26.4796 20.1264
0 0.65842 1.02984 255909 188199 3.03582 126174.0 1.42056 65.842 3.17366 33.4944 4.93775 30.208 9.61265 -4.72237 1.27419 20.2884 14.5525 3.90756 27.2887 17.3986 55.3127