| Day | STAC (%) | EXPECT (%) | Travelers | Drivers | Free Flow Travel Cost (€) | Collected Revenues (€) | Peak Period Length (h) | Congestion (%) | Mileage (10^6 km) | Speed (km/h) | Number of Roads | Travel Time (min) | Travel Cost (€) | Consumer Surplus (€) | Equity (€) | Mean Early Delay (min) | Mean Late Delay (min) | Schedule Delay Cost (€) | Early Ratio (%) | On-Time Ratio (%) | Late Ratio (%) |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 0 | 0.75 | 0.0 | 4 | 4 | 6.0 | 0.0 | -16.2042 | 75.0 | 0.00012 | 28.5714 | 1.5 | 48.0 | 8.83125 | -9.20443 | 1.08863 | 0.0333333 | 9.96667 | 0.83125 | 25.0 | 50.0 | 25.0 |