| Day | STAC (%) | EXPECT (%) | Travelers | Drivers | Free Flow Travel Cost (€) | Collected Revenues (€) | Peak Period Length (h) | Congestion (%) | Mileage (10^6 km) | Speed (km/h) | Number of Roads | Travel Time (min) | Travel Cost (€) | Consumer Surplus (€) | Equity (€) | Mean Early Delay (min) | Mean Late Delay (min) | Schedule Delay Cost (€) | Early Ratio (%) | On-Time Ratio (%) | Late Ratio (%) |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 0 | 0.0 | 0.0 | 4 | 4 | 8.0 | 0.0 | 16.6461 | 0.0 | 0.00016 | 50.0 | 2.0 | 48.0 | 8.12847 | -9.31767 | 1.10359 | 0.766667 | 0.675 | 0.128472 | 25.0 | 25.0 | 50.0 |