| Day | STAC (%) | EXPECT (%) | Travelers | Drivers | Free Flow Travel Cost (€) | Collected Revenues (€) | Peak Period Length (h) | Congestion (%) | Mileage (10^6 km) | Speed (km/h) | Number of Roads | Travel Time (min) | Travel Cost (€) | Consumer Surplus (€) | Equity (€) | Mean Early Delay (min) | Mean Late Delay (min) | Schedule Delay Cost (€) | Early Ratio (%) | On-Time Ratio (%) | Late Ratio (%) |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 0 | 0.0 | 0.0 | 2 | 2 | 0.408333 | 3.0 | 16.3436 | 0.0 | 0.000004 | 48.9796 | 4.0 | 2.45 | 1.97153 | -4.1297 | 0.487804 | 1.51667 | 0.0 | 0.0631944 | 50.0 | 50.0 | 0.0 |