| Day | STAC (%) | EXPECT (%) | Travelers | Drivers | Free Flow Travel Cost (€) | Collected Revenues (€) | Peak Period Length (h) | Congestion (%) | Mileage (10^6 km) | Speed (km/h) | Number of Roads | Travel Time (min) | Travel Cost (€) | Consumer Surplus (€) | Equity (€) | Mean Early Delay (min) | Mean Late Delay (min) | Schedule Delay Cost (€) | Early Ratio (%) | On-Time Ratio (%) | Late Ratio (%) |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 0 | 0.0 | 0.0 | 100 | 100 | 11.6583 | 0.0 | 2.46944 | 0.0 | 0.0115 | 98.6419 | 12.0 | 69.95 | 13.0862 | -13.9573 | 0.150608 | 21.6667 | 8.15595 | 1.42783 | 58.0 | 28.0 | 14.0 |