| Day | STAC (%) | EXPECT (%) | Travelers | Drivers | Free Flow Travel Cost (€) | Collected Revenues (€) | Peak Period Length (h) | Congestion (%) | Mileage (10^6 km) | Speed (km/h) | Number of Roads | Travel Time (min) | Travel Cost (€) | Consumer Surplus (€) | Equity (€) | Mean Early Delay (min) | Mean Late Delay (min) | Schedule Delay Cost (€) | Early Ratio (%) | On-Time Ratio (%) | Late Ratio (%) |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 0 | 0.000111797 | 0.0000422001 | 28800 | 3800 | 0.0523085 | 0.0 | 1.15194 | 0.0111797 | 0.00115799 | 58.2509 | 1.18132 | 0.652667 | 1.62085 | -2.30615 | 0.0450771 | 24.6466 | 5.77652 | 1.51207 | 58.8421 | 25.3947 | 15.7632 |