| Day | STAC (%) | EXPECT (%) | Travelers | Drivers | Free Flow Travel Cost (€) | Collected Revenues (€) | Peak Period Length (h) | Congestion (%) | Mileage (10^6 km) | Speed (km/h) | Number of Roads | Travel Time (min) | Travel Cost (€) | Consumer Surplus (€) | Equity (€) | Mean Early Delay (min) | Mean Late Delay (min) | Schedule Delay Cost (€) | Early Ratio (%) | On-Time Ratio (%) | Late Ratio (%) |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 0 | 0.0 | 0.0 | 28800 | 3800 | 0.0000709064 | 0.0 | -12.2042 | 0.0 | 0.00000163 | 60.4948 | 0.00184211 | 0.652632 | 1.61257 | -2.3063 | 0.0459578 | 24.1062 | 5.73444 | 1.5038 | 61.2368 | 24.4474 | 14.3158 |