| Day | STAC (%) | EXPECT (%) | Travelers | Drivers | Free Flow Travel Cost (€) | Collected Revenues (€) | Peak Period Length (h) | Congestion (%) | Mileage (10^6 km) | Speed (km/h) | Number of Roads | Travel Time (min) | Travel Cost (€) | Consumer Surplus (€) | Equity (€) | Mean Early Delay (min) | Mean Late Delay (min) | Schedule Delay Cost (€) | Early Ratio (%) | On-Time Ratio (%) | Late Ratio (%) |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 0 | 0.0 | 0.0 | 28800 | 3800 | 0.0000365497 | 0.0 | -12.2042 | 0.0 | 0.00000071 | 51.12 | 0.000526316 | 0.652632 | 1.59338 | -2.306 | 0.0439969 | 24.0325 | 6.16084 | 1.48461 | 60.3947 | 26.2105 | 13.3947 |